1-Covering drain No. 5 with a length of 735 meters
2-Stone pitching El-Mallah sea Bridge with a length of 441 m
3-Constructing pedestrians sidewalk with a length of 660 m
4-Constructing two-way road with 6.6 m width for each direction
5-Constructing a service road with a width of 6 m
6-Rehabilitating Al-Thawra Street and extending it with a length of 1300 meters, which is the main street inside the village of Mahalla Abu Ali, and making sidewalks on both sides of the road