Description of the project
Etay El-Barood High Way (Bridge)
Bridge over the railway , the agricultural road and the canal with total length 850 m and width 15 m
Details of the project
Client :Ministry of Transportation Public Authority For Roads & Bridges |
Activity :Bridges |
Location :Alexandria |
Project Status :Finished |